Murphy USA Fuel Station Celina, TX

New Construction

Status

Accepting Bids

Bid Date 12/19/25 10:00am

Company

...

Location

1530 S Preston Rd Celina, TX 75078

Project Summary: The project consists of the ground-up construction of a new Murphy Express convenience store, including all site development, utilities, concrete paving, fuel system installation support, and building/canopy foundations. Work includes demolition and environmental coordination, complete earthwork and grading, installation of storm, water, and sanitary systems, electrical and plumbing/mechanical infrastructure, and all GC responsibilities associated with modular building and canopy erection by Frey-Moss. The contractor will also provide required testing, inspections, documentation, and Murphy-specific GC scope items such as pump toppers, decals, interior specialties, and final cleaning.

Project Scope Includes: Site Demoliton, Earthwork, Land Survey, Concrete, Electrical, Plumbing, Mechanical, Landscape, Irrigation, Masonry, Security Systems, Utilities, Erosion Control, Asphalt/Concrete Pavement, Striping, Signage, Temporary Fencing, Fuel Tank System Installation, Cleaning, Power Washing, Bollards, Specialties Installations, Caulking, Dumpsters, Office Trailers, Portable Bathrooms.

Note: Project scope of work is limited to what is showed as General Contractor responsabilities or scope of work.

Bid Instructions: Please fill the bid form located in the other documents section. Include all materials and labor for the trade you bid on. Additionally, Please attach your company's proposal sheet, ensure your company proposal includes the line item break-downs as needed. Include how many mobilizations along with how many days for each mobilization is needed.

Note to Bidders

Note: Project scope of work is limited to what is showed as General Contractor responsibilities or scope of work. Bid Instructions: Please fill the bid form located in the other documents section. Include all materials and labor for the trade you bid on. Additionally, please attach your company's proposal sheet, ensure your company proposal includes the line item breakdowns as needed. Include how many mobilizations along with how many days for each mobilization is needed.