Jim N Nick's Columbus, GA

New Construction

Status

Bidding Closed

Bid Date4/24/24 4:00pm

Company

...

Location

Whittlesey Boulevard Columbus, GA 31909

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 1.48 AC
Building SF: 6,276 SF
Structural Type: Wood Framed
Brief Project Description: Ground up Jim N Nicks. Landlord will Deliver all Utilities to 10' of the Building. A Certified Pad 11" Below FF will be provided by Landlord as Well. Asphalt/Concrete at Site. Hardie, Brick and Tile at Building Exterior.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes - Make Sure Grades Provided by LL are Correct/Please Include Hauling Canopy Footer Soils
2-f Site Utilities (Storm, Water, Sewer) Yes - All Utilities to be Delivered to Within 10' of Building/Please Include Extended Fire Line into Building Footprint with Fore Riser at 1' AFF
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes
2-m Landscaping Yes
2-n Irrigation Yes
2-q NPDES Monitoring Yes
2-r Surveying Yes
2-s Construction Material Testing Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes, 3000/4000 PSI / Estimated CY:  300
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes - Please Include Canopy Footers/Please Include Menu Board Footers (A1.6)
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes, #57 Stone / Estimated tons: 500
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes - Cherokee "Old French Quarter" Thin Brick
4-b Block Material Yes - 8" Reg/8" BB
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes

5. Metals
5-c Building Steel Turnkey Yes - Please Include Chimney Cap/Menu Board Frames/Foot Rail at Bar

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-d Countertops Yes - Please Include Butcher Block Counter at Bar
6-e Wood Interior Trim Material Yes
6-f Wood Interior Trim Install Yes
6-i Wood Truss Material Yes
6-j Wood Truss Install Yes
6-k Lumber Material - Structural Wood Yes
6-l Lumber Install (Bldg Framing) Yes
6-m Bolt Package Yes

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes
7-b Roofing - Metal Roofing Yes - Please Include Additional Metal Roofing at Chimney/Please Include Dumpster Roof
7-g Hardie Board Yes
7-h Batt Insulation Yes
7-k Caulking Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes - Please Include Sliding Doors and Track System
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes - Please Price Kawneer Alternate/Please Include Installing Chicago Bi Fold Windows

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote
9-e Flooring (Ceramic or Quarry Tile) Yes
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes

15. Mechanical
15-a Plumbing Yes
15-b Fire Sprinkler Yes
15-e HVAC Turnkey Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes