Headworks Rehabilitation Ambassador Caffery Wastewater Treatment Plant Lafayette, LA
Renovation
Status
Bidding Closed
Bid Date6/8/23 10:00pm
Company
...
Location
Lafayette, LA 70503
Project Description: The work includes the installation of a ductile iron overflow pipe and baffle assembly, remove and replace manual bar screen, and install new weir gate in the headworks of the plant to bypass the flow into the equalization basin, chipping, reinforcing steel replacement, cleaning, repair and coating if the interior concrete surfaces of the headworks and all other associated work and the repair of washdown
piping in the equalization basin. All work shall be completed within 180 calendar days from the issuance of Notice to Proceed.