Wawa 5803 Robertsdale AL

Renovation

Status

Bidding Closed

Bid Date9/13/23 4:00pm

Company

...

Location

HWY 59 & CR 48 Robertsdale, AL 36567

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 2.13 AC
Building SF: 7,208 SF
Structural Type: Steel & Metal Frame
Brief Project Description: Landlord is handling mass site work and some paving/utilities. Tank, fuel line, and concrete footing spoils will need to be hauled off. Asphalt and Concrete Paving on site.  Structural steel building with metal stud infill.  Exterior finishes are Hardie, Stucco, Brick & ATAS.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes - Pleas include Spoils Removal for Tanks, Fuel Lines & Concrete Footers/Please Include Traffic Control per Plans
2-f Site Utilities (Storm, Water, Sewer) Yes - Please Include  Grease Trap/Please Include Planter Drains and Water Line to Dumpster
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes - Please Include Traffic Control
2-m Landscaping Yes - Please include Planter Boxes (Detail on L1.3)
2-n Irrigation Yes
2-q NPDES Monitoring Yes
2-r Surveying Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes - 3000/4000 PSI
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes  - Please include Stamped/Colored Concrete (Detail on A11.0)
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes - Alabama Thin Brick on Tabs II Panels
4-b Block Material Yes - 8" Reg/8" BB
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes
4-k Precast (Sills, Water Table, Caps) Yes - Boral Stone (Taupe CSV-1375)/Italian Cast Stone (White)

5. Metals
5-c Building Steel Turnkey Just price for Island Forms, all other furnished and installed by Owner

6. Carpentry
6-a FRP Material Yes - Acrovyn Sheets at Specified Walls and Doors (A0.5 for Details)
6-b FRP Install Yes
6-c Cabinetry Yes - Install (See EQ-1.0)
6-d Countertops Yes
6-e Wood Interior Trim Material Yes - Clear Pine Interior Wall Trim
6-f Wood Interior Trim Install Yes
6-g Wood Exterior Trim/Siding Install Yes
6-h Kitchen Equipment (Install Only) Yes - Install (See EQ-1.0)

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes - Single Ply Membrane (R-40)
7-b Roofing - Metal Roofing Yes - ATAS Metal Roofing (A4.0 for Detail)/Please include Ice & Water Shield, Include Shed @ Dumpster
7-e ACM Panels Yes - ATAS (A4.0 for Details)
7-f Stucco or EFIS Yes
7-g Hardie Board Yes
7-h Batt Insulation Yes
7-k Caulking Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes - Kawneer Trifab IR501 & 450/Please include Spandrel Glass
8-g Window Film Yes- Opaque Vinyl Film

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote/Please include Rigid Insulation where Shown/Please include Stainless Steel Wall Panels/Please include Cement Board & Durock/Please include Plywood Decking at Restroom Ceilings and Tower/Please include Setting Metal Trusses at Tower
9-c Metal Trusses Yes - At Tower
9-e Flooring (Ceramic or Quarry Tile) Yes
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes - Terrazon Flooring/Epoxy Flooring
9-j Flooring (Speciality) Yes - Ultra Entry Mats (Mary Crane (781)573-0285))/Anti Fatigue Surface (Ecore International)
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-e Shutters Yes - Prefinished Aluminum Baha Shutter (Kerri Beals (813)343-5979
10-f Blinds Yes - Roller Shades at all Glazing Below 11'0"

15. Mechanical
15-a Plumbing Yes
15-e HVAC Turnkey Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-a Lighting Material Yes
16-b Gear Material Yes
16-e Fire Alarm Yes - Install Equip.
16-f Low Voltage Wiring Yes - Install Equip