Jim N Nick's Dothan, AL

New Construction

Status

Bidding Closed

Bid Date4/8/24 4:00pm

Company

...

Location

3320 Montgomery HWY. Dothan, AL 36303

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 1.93 AC
Building SF: 6,276 SF
Structural Type: Wood Framed
Brief Project Description: New ground up Jim N Nick's and site work. Demo of existing 1 story building with existing parking lot. Building features include Thin Brick, and Hardie siding. Interior flooring is Tile and sealed/ polished concrete.

2. Site Construction
2-b Demolition (Interior or Exterior) Yes
2-c Erosion Control Yes
2-d Sitework, Grading Yes- Please include removal and haul away of all spoils
2-f Site Utilities (Storm, Water, Sewer) Yes- Please include 2" water line to the building and the 1/2" water to dumpster/ The sewer is 6" and the tap is in the road, please include/ Storm water and trench drain shown on C3.0, please include/ Please include 1,50 Gal Grease Trap/ Please include fire line and stubbing riser in building/ Please include both domestic and irrigation BFP's
2-j Striping & Site Signage Yes- Please include wheel stops
2-k Asphalt paving Yes- Please include milling and overlay
2-m Landscaping Yes
2-n Irrigation Yes
2-q NPDES Monitoring Yes
2-r Surveying Yes
2-s Construction Material Testing Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes - 3000/4000 PSI: 400 CY
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes - Please Include Canopy Footers
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes- 300 TN
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes - Cherokee Thin Brick ("Old French Quarter")
4-b Block Material Yes - 8" Reg/8" SF/8" BB
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes- Please include Dumpster per A5.3

5. Metals
5-c Building Steel Turnkey Yes - 4 Steel Menu Boards/Bollards/Dumpster Gates/Roof Ladder/HSS at Pit Tower/Pipe Rail at Bar/Misc. Steel

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-d Countertops Yes - Install millwork counters, wood displays, counters and cabinets/ Quartz countertop, butcher block furnish and install
6-e Wood Interior Trim Material Yes
6-f Wood Interior Trim Install Yes
6-g Wood Exterior Trim/Siding Install Yes - See Schedule on A6.2
6-h Kitchen Equipment (Install Only) Yes- Please include installing booths, tables, and chairs/ Wood trim/ Siding ect.
6-i Wood Truss Material Yes- Please reach out to redbuilt
6-j Wood Truss Install Yes
6-k Lumber Material - Structural Wood Yes
6-l Lumber Install (Bldg Framing) Yes
6-m Bolt Package Yes

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes - Carlisle 50 MIL sure-flex PVC/ 20 Year Warranty/ White
7-b Roofing - Metal Roofing Yes - Peterson Aluminum/Please inlclude custom Hammered Steel Cap
7-g Hardie Board Yes - See Schedule on A6.2
7-h Batt Insulation Yes
7-k Caulking Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-c Garage/Roll-up Doors Yes
8-e Storefront & Glass Yes - Please include Custom Iron Doors (Install Chicago Bifold Doors)

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote/Please include Metal Stud Framing at Pit Tower Interior
9-e Flooring (Ceramic or Quarry Tile) Yes
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes

15. Mechanical
15-a Plumbing Yes
15-b Fire Sprinkler Yes
15-e HVAC Turnkey Yes - RTU's provided by owner, contractor to install
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes - Lighting & Gear provided by owner, contractor installed/ Please include secondary
16-e Fire Alarm Yes