Valvoline Opelika, AL

New Construction

Status

Bidding Closed

Bid Date4/9/24 4:00pm

Company

...

Location

3025 Pepperell Parkway Opelika, AL 36801

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 0.70 AC
Building SF: 2,089 SF
Structural Type: Wood Frame/ Wood Stud
Ground up VIOC. Single Story building with a lube pit. Thick concrete walls poured in place with basement waterproofing.
2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes-Include Excavating the basement and benching back/ Please include dirt and #57 stone backfill (Furnish and install) for the backfill of pit walls, also include the GeoFabric/ Please include stone under pit slab furnish and install/ Please include the sump pump manholes furnish and install/ Please include unit prices for rock removal, if you need the sheet to fill out contact
tdaniel@cbigc.com
2-f Site Utilities (Storm, Water, Sewer) Yes- Please include sump pump manhole and the foundation drain. Sump Pump Manhole detail on P-2.1, try pricing using grading elevations (10' manhole)/ Please include roof drains and connection to storm system
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes
2-m Landscaping Yes
2-n Irrigation Yes
2-r Surveying Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes, 3000/4000 PSI / Estimated CY:  500-550 CY's
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes- Please include Footings, Pit Slab, Slab on Deck, Pit Walls, and all site concrete
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes, #57 Stone / Estimated tons: 400-450 TN's
3-g Rebar / Wire Mesh Yes
3-k Cast-in-Place Wall (CIP) Yes- CIP Basement Walls

4. Masonry
4-a Brick Material Yes- Belden "Modular Midland Blend"/ Belden "Modular Hamilton Blend"
4-b Block Material Yes- 8" Bond/ 8" Regular
4-d Masonry Labor Yes- Please include Monument sign in pricing/ Please include dumpster enclosure in pricing/ Please price per manufactures on elevations
4-e Masonry Turnkey Yes- Please include Monument sign in pricing/ Please include dumpster enclosure in pricing/ Please price per manufactures on elevations
4-k Precast (Sills, Water Table, Caps) Yes- Price per elevations/ Please include dumpster in pricing/ Custom Cast Stone

5. Metals
5-c Building Steel Turnkey Yes- Steel at basement for floor support, Dumpster gates, Bollards, Misc. steel, and Steel Decking

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-c Cabinetry Yes- Please include the 5 Door cabinet in office.
6-d Countertops Yes
6-i Wood Truss Material Yes
6-j Wood Truss Install Yes
6-k Lumber Material - Structural Wood Yes- Please price CDX plywood, NOT OSB
6-l Lumber Install (Bldg Framing) Yes
6-m Bolt Package Yes

7. Thermal and Moisture Protection
7-c Roofing - Shingle Roofing Yes- Please include Owens Corning Duration Shingles with synthetic roof underlayment and Grace industries ice & water barrier per plans.
7-f Stucco or EFIS Yes- Dryvit (Sand Pebble Fine)
7-h Batt Insulation Yes
7-k Caulking Yes- Please include GCP Bituthene 4000 with ADCOR 500 waterstop/ Include Tyvec commercial weather wrap/ Please price the waterproofing detail on A-1.1 and include the Hydroduct.
7-l Moisture Protection Yes- Please include GCP Bituthene 4000 with ADCOR 500 waterstop/ Include Tyvec commercial weather wrap/ Please price the waterproofing detail on A-1.1 and include the Hydroduct.

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-c Garage/Roll-up Doors Yes- Overhead door or Clopay only
8-e Storefront & Glass Yes- Kawneer 451 per plans/ Please include any break metal shown

9. Finishes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote
9-d Flooring (VCT, Carpet, LVT) Yes- Tarkett 12"x12"x1/8" VCT (Wax Floor) on Sheet A-1.2
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes- Masterkure CC 300 SB, 3 Coats min. Also provide light broom finish in Lube pit
9-g Flooring (Silikal) Yes- Silikal/ ResTek/ Duraflex; Must price one of these specs
9-k Painting (Interior & Exterior) Yes- Please include Masterkure floor sealer

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-d Awnings Yes - Firestone Una-clad Kynar 500/ Hylar metal 5000
10-z Knox Box Yes
10-hh Corner Guards Yes

15. Mechanical
15-a Plumbing Yes- Please include Sump pumps detail on P-2.1, try pricing using grading elevations (10' manhole). Please include drain at footing of basement. Please include oil water sep and BFP preventor inside building
15-e HVAC Turnkey Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes- Please include the site lighting and underground electrical/ Please include Power to monument sign