Scope of Work includes but is not limited to, construction of the new facility located on the City’s Property at 350 E. Main

Street, Centre, AL. The Work generally consists of site utilities relative to tying in the new building to existing sanitary, gas,

electric and water services, site improvements relative to new construction, utility improvements, demolition of the existing

Centre Middle School and other existing onsite buildings indicated, New work will consist of, but is not limited to, structural

steel framing, metal stud in-fill, metal stud and drywall partitions, masonry veneer, light-gage metal roof trusses, composition

shingle roofing, soft tile and hard tile floor finishes, lay-in and gyp. board ceilings, hollow metal doors and frames, prefinished

wood doors, hardware, HVAC, Electrical, toilet compartments and toilet accessories, mobile file system,

casework/millwork and new commercial kitchen facilities. Facility size is approximately 8,300 s.f.

There is a pre-bid meeting on Monday April 22, 2024 at the Jobsite in Centre.  This is not mandatory for

Subcontractors but I wanted to let everyone know in case they wanted to visit the site.

This project IS NOT TAX EXEMPT.  

Include all sale tax with your quotes