Mavis Tire 2217 Macon, GA

New Construction

Status

Bidding Closed

Bid Date4/30/24 4:00pm

Company

...

Location

1518 Bass Road Macon, GA 31210

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: 1.14 AC
Building SF: 6,952 SF
Structural Type: Block & Bar Joist
Brief Project Description: Ground up construction of 8 bay Mavis Tire & Brakes. Masonry and steel structure with veneer consisting of EIFS, Stone and ATAS Metal Panels with Polished concrete, kids rubber tile flooring area, and VCT in waiting.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes
2-f Site Utilities (Storm, Water, Sewer) Yes
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes
2-m Landscaping Yes
2-n Irrigation Yes- Please Include Sleeves
2-o Retaining Wall Yes - CIP Wall per C9.03
2-p Fencing Yes - Dumpster Chain Link with Privacy Slats (A-801)
2-q NPDES Monitoring Yes
2-r Surveying Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes, 3000/4000 PSI / Estimated CY:  450-500CY
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes - Please Include CIP Retaining Wall per Details on C9.03
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes, #57 Stone / Estimated tons:450-500 CY
3-g Rebar / Wire Mesh Yes

4. Masonry
4-b Block Material Yes - 6" Reg/6" BB/8" Reg/8"BB/10" Reg/10" BB/8"SF/8"SF Corner/8"SF Bond
4-c Masonry Accessories Yes
4-d Masonry Labor Yes- Please include dumpster enclosure
4-e Masonry Turnkey Yes- Please include dumpster enclosure
4-j Stone Turnkey Yes - Dutch Quality Stone

5. Metals
5-c Building Steel Turnkey Yes- Please include misc site and building steel/Please Include Haindrail for Retaining Wall per C9.03

6. Carpentry
6-a FRP Material Yes - Please include INPRO
6-b FRP Install Yes
6-d Countertops Yes - Install of Service Counter and Computer Tech Section

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes - PVC roofing fully adhered on rigid insulation on 1 1/2" metal deck color is white/ Please include smoke vents/ Please include ATAS metal veener on elevations
7-b Roofing - Metal Roofing Yes - ATAS Metal Fascia and Aluminum Accent Trim
7-f Stucco or EFIS Yes- Dryvit
7-h Batt Insulation Yes
7-i Masonry Insulation Yes
7-k Caulking Yes- Please include interior and exterior water barrier
7-l Moisture Protection Yes- Please include interior and exterior water barrier

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes - Kawneer only/Please include interior glass

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote/Please include plywood/Please include Rigid Insulation/Please include Parapet Blocking/ Please include INPRO wall panels/ Please include FRP
9-d Flooring (VCT, Carpet, LVT) Yes - LVT
9-h Flooring (Rubber) Yes - Rubber tile by Mats Inc
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes - See National Account
10-b Fire Extinguishers Yes
10-hh Corner Guards Yes - INPRO

15. Mechanical
15-a Plumbing Yes- Please include gas piping/ Please include oil interceptor/ Please include exterior hose bibb where water service enters the building/ Please include air line piping
15-e HVAC Turnkey Yes- Please include gas unit heaters
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes- Please include power to monument sign/ Please include secondary/ Please include site lighting
16-e Fire Alarm Yes