Whataburger Atalla, AL
Remodel
Addendum #1
(click to expand/collapse)
ADD#1 Notes:
Please review ADD#1 drawings for the full scope of changes. Noted changes included but not limited to:
More site concrete
Topo of new concrete
Erosion control measures
Modification to FEC (Affects Plumber and Electrical)
Removal of 1 Soda Dispenser (Affects Plumber and Electrical)
Moved the EWH to a new location
Changed Manufacturer of EWH
Change to Electrical Riser
Mechanical changes
Electrical Note changes
Added Roof Antennas
Added OS in areas
Circuit Changes
Added 1 new panel and added the 4 KEC panels
Added manager office plan
Added control system plan
Please review ADD#1 drawings for the full scope of changes. Noted changes included but not limited to:
More site concrete
Topo of new concrete
Erosion control measures
Modification to FEC (Affects Plumber and Electrical)
Removal of 1 Soda Dispenser (Affects Plumber and Electrical)
Moved the EWH to a new location
Changed Manufacturer of EWH
Change to Electrical Riser
Mechanical changes
Electrical Note changes
Added Roof Antennas
Added OS in areas
Circuit Changes
Added 1 new panel and added the 4 KEC panels
Added manager office plan
Added control system plan
Name | Size | ||
Addendum 1 | 22.6 MB |