AutoZone 9390 Hanceville, AL

New Construction

Status

Accepting Bids

Bid Date5/21/24 4:00pm

Company

...

Location

Main Street Northeast Hanceville, AL 35077

SCOPE OF WORK
DIV TRADE GENERAL DESCRIPTION
Site Acreage: .75 AC
Building SF: 5,654 SF
Structural Type: Block & Bar Joist
Brief Project Description: Ground Up AutoZone. Demo of Asphalt Paving and Curb on Site. Asphalt and Concrete Throughout. Painted Smooth Face Block at Exterior. Sealed Concrete and Vinyl Tile at Interior.

2. Site Construction
2-c Erosion Control Yes
2-d Sitework, Grading Yes - Please Include all Demo per D1.0
2-f Site Utilities (Storm, Water, Sewer) Yes - Please Include 15" Class 1 Rip Rap at Flumes
2-j Striping & Site Signage Yes
2-k Asphalt paving Yes - Mill & Overlay at Entrance/Full Depth at Rest of Site within Disturbance Lines (1.5"/2.5"/8")
2-m Landscaping Yes
2-n Irrigation Yes
2-p Fencing Yes - 6' Wood Enclosure with Steel Gates (Pine Boards on Gates)(Detail 9 & 10 on C1.A)
2-r Surveying Yes

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes, 3000/4000 PSI / Estimated CY: 400
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes - Please Include Foundation for Pylon Sign
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes, #57 Stone / Estimated tons: 600
3-g Rebar / Wire Mesh Yes

4. Masonry
4-b Block Material Yes - 4" Reg/8" Reg/8" BB
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes

5. Metals
5-c Building Steel Turnkey Yes - Joists and Decking Provided by Owner

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes - 50 MIL White PVC/Please Include Roof Hatch
7-f Stucco or EFIS Yes
7-h Batt Insulation Yes
7-k Caulking Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-c Garage/Roll-up Doors Yes - Chain Operated Overhead Door
8-e Storefront & Glass Yes - Please Include Clerestory Windows/Please Include Black Faux Glass/Please Include Red Kynar Finish on Aluminum Storefront

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; Please Include Parapet and In Wall Blocking/Please Include 6" Wide Horizontal 20 Gauge Strip Around Perimeter Behind Gyp. Board
9-d Flooring (VCT, Carpet, LVT) Yes - Vinyl Tile
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes - Sealed Concrete
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-a Bathroom Accessories Yes
10-b Fire Extinguishers Yes
10-s Bollards, Covers & Sleeves Yes - Red Sleeves for Bollards

15. Mechanical
15-a Plumbing Yes - Hot Water Heater Provided by Owner
15-e HVAC Turnkey Yes - Curbs, RTU`s, Plenums, Ducts, Diffusers, Thermostat Controls, Venstar Sensors and Accessories Provided by Owner
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes - Lighting, Panelboards, Disconnects, Circuit Breakers and Gear Provided by Owner