Walmart Remodel 409-212 Haleyville, AL
Status
Accepting Bids
Bid Date | 10/23/24 12:00pm |
Company
Location
42466 Highway 195, Haleyville, AL 35565
Remodel – 91,514 sf existing
Construction duration is 01/5/25 Through 04/10/25
Questions to Nathan Malone nathan.malone@white-spunner.com 251-533-1508 or Travis Deatherage travis.deatherage@white-spunner.com 251-300-3840
Send quotes to estimating@white-spunner.com or fax to 251-300-3870
See Appendix A for the FBO items by spec as well as the OS1 Sheet.
Civil is re-striping and signage of the parking lot.
Striping, Seal Coating, Selective Demo, Footings, Floor Patching/Concrete infill, Misc. Steel, Blocking, Millwork, Joint sealants, Waterproofing, Roofing, Doors and Hardware (FBO), Acoustical ceiling, Metal stud framing, Drywall, Tape and Finish, Paint, Pressure Wash Exterior, Fixture Anchoring, Cleaning of Duct, NRP install only, E.I.F.S., TPO Roofing, Ceramic Tile Install only (full bathroom remodel), Quarry Tile Install only, Resilient Flooring (FBO), Specialties, Partitions and Accessories install only, Energy Management Install, Sub metering Install, Refrigeration Install, HVAC (RTU FBO), Plumbing, Fire Sprinkler system, Electrical (switch gear and fixtures FBO).