Irondale Civic Center Project Irondale, AL
Renovation
Addendum #1
(click to expand/collapse)

Addendum #10
(click to expand/collapse)

Name | Size | ||
Add - 10 - Grilling Station - Drawings | 224.4 KB | ||
Add - 10 - Grilling Station - Specs | 89.7 KB | ||
ADD 10 | 23.3 MB | ||
Addendum 10 - BDA System | 85.8 KB | ||
Addendum 10 - Concrete Countertops | 117.8 KB | ||
Addendum 10 - EC Raceways Boxways for EC Systems | 205.3 KB | ||
Addendum 10 - Exterior Paint | 114.1 KB | ||
Addendum 10 - Glazing | 137.8 KB | ||
Addendum 10 - Narrative | 319.1 KB | ||
Addendum 10 - Operable Partitions | 113.0 KB | ||
Addendum 10 - Sheet Metal Flashing Trim | 143.7 KB | ||
Addendum 10 - Specs - Ex Roof | 101.7 KB | ||
Addendum 10 - Specs | 2.3 MB | ||
Addendum 10 - Structured Cabling | 148.1 KB | ||
Irondale Civic Center Drawings - Add 10 | 24.5 MB |
Addendum #11
(click to expand/collapse)

Addendum #13
(click to expand/collapse)

Addendum #2
(click to expand/collapse)

Name | Size | ||
Irondale Civic Center - Add 2 - Narrative for Subcontractors-1 | 240.7 KB | ||
Irondale Civic Center - Fire Alarm Spec | 485.3 KB |
Addendum #4
(click to expand/collapse)

Name | Size | ||
Irondale Civic Center - Add 4 Drawings | 13.9 MB | ||
Irondale Civic Center - Add 4 Narrative-1 | 119.5 KB |
Addendum #5
(click to expand/collapse)

Name | Size | ||
Irondale Civic Center - Add 5 Narrative | 137.7 KB | ||
Irondale Civic Center - Add 5- Asbestos Specs | 378.6 KB | ||
Irondale Civic Center - Add 5- Spec - Table of Contents | 115.2 KB | ||
Irondale Civic Center - Add 5- Spec - Thermal Insulation | 108.3 KB |
Addendum #6
(click to expand/collapse)

Addendum #7
(click to expand/collapse)

Addendum #9
(click to expand/collapse)

Project Alternates and Sales Tax Exemption
(click to expand/collapse)

When submitting your bid - Please confirm the following:
1. This project is tax exempt. Please confirm you have NOT included sales tax in your pricing: __________.
2. Please state the value of the sales tax you would have collected: $______.
Please Note: This project contains 10 Project Alternates. Please break-out any costs associated with the below alternates:
1. Project Alternate # 1: Canopy Alternate:
See A-404A: $__________.
2. Project Alternate # 2: Playground:
Costs Associated with the Playground: $__________.
3. Project Alternate # 3: Splash Pad:
Costs Associated with the Splash Pad: $__________.
4. Project Alternate # 4: Walking Paths:
Costs Associated with the Concrete Walking Paths: $__________.
5. Project Alternate # 5: Pickle Ball Courts
Costs Associated with the Pickle Ball Courts: $___________.
6. Project Alternate # 6
Costs Associated with the Pavillion: $___________.
7. Project Alternate # 7: Amphitheater
Costs Associated with the Amphitheater. $__________.
8. Project Alternate # 8: Parking Lot #1 (Small Lot)
Costs Associated with the Lower East Parking Lot: $__________.
9. Project Alternate # 9: Parking Lot # 2 (Large Lot)
Costs associated with the West Parking Lot: $__________.
10. Project Alternate # 10: Pavers at Outdoor Plaza
Costs Associated with the Pavers at the Outside Plaza: $__________.
1. This project is tax exempt. Please confirm you have NOT included sales tax in your pricing: __________.
2. Please state the value of the sales tax you would have collected: $______.
Please Note: This project contains 10 Project Alternates. Please break-out any costs associated with the below alternates:
1. Project Alternate # 1: Canopy Alternate:
See A-404A: $__________.
2. Project Alternate # 2: Playground:
Costs Associated with the Playground: $__________.
3. Project Alternate # 3: Splash Pad:
Costs Associated with the Splash Pad: $__________.
4. Project Alternate # 4: Walking Paths:
Costs Associated with the Concrete Walking Paths: $__________.
5. Project Alternate # 5: Pickle Ball Courts
Costs Associated with the Pickle Ball Courts: $___________.
6. Project Alternate # 6
Costs Associated with the Pavillion: $___________.
7. Project Alternate # 7: Amphitheater
Costs Associated with the Amphitheater. $__________.
8. Project Alternate # 8: Parking Lot #1 (Small Lot)
Costs Associated with the Lower East Parking Lot: $__________.
9. Project Alternate # 9: Parking Lot # 2 (Large Lot)
Costs associated with the West Parking Lot: $__________.
10. Project Alternate # 10: Pavers at Outdoor Plaza
Costs Associated with the Pavers at the Outside Plaza: $__________.
Scope Sheets
(click to expand/collapse)

Name | Size | ||
03 Concrete | 85.4 KB | ||
03 Concrete Cutting | 45.0 KB | ||
03 Sports Surface System | 45.0 KB | ||
04 Masonry | 45.0 KB | ||
05 Light Gauge Metal Truss | 38.8 KB | ||
05 Steel | 46.0 KB | ||
06 Millwork and Finish Carpentry | 45.2 KB | ||
07 Caulking | 45.0 KB | ||
07 EIFS Stucco | 45.0 KB | ||
07 Fireproofing | 38.3 KB | ||
07 Roofing | 45.1 KB | ||
08 Doors Frames and Hardware | 45.1 KB | ||
08 Storefront | 45.0 KB | ||
09 Drywall | 45.4 KB | ||
09 Flooring | 45.0 KB | ||
09 Painting and Wallcovering | 45.0 KB | ||
10 Awnings and Canopies | 45.0 KB | ||
10 Signage | 45.0 KB | ||
10 Specialties | 45.1 KB | ||
14 Elevators | 45.1 KB | ||
21 Fire Protection | 45.0 KB | ||
22 Plumbing | 44.9 KB | ||
23 HVAC | 46.1 KB | ||
26 Electrical | 46.1 KB |